Availability Loss Reduction

Increased Uptime By ~30%

Tyre Building Machines

Problem Statement

Line was struggling with high downtime. They had to objectively capture downtime events and associated reasons and faults.

Case Drilldown:

Linecraft auto-captured and attributed all major and minor downtimes. Using our pareto of faults captured, the maintenance team prioritized their activities.

Result

By focusing on the top 20% faults captured by Linecraft, the customer was able to significantly improve and sustain the availability of the entire line.

Other Case Studies