Engine Assembly Line
Reduced Cycle Time By 7%
Performance Improvement
Problem Statement
Old assembly line was working at designed takt time but an increase in market demand was expected in near future

Linecraft correctly identified a semi-automated torquing station as a bottleneck for the existing throughput. Its cycle data analysis showed that the automatic part of the cycle is consistent every time, but there’s a high variability in the time for manual work content.