Production ramp up on a newly commissioned engine line
Case Drilldown:
Linecraft continually monitored the critical stations on the line during ramp-up phase. Real time insights on A, P, and Q losses and insights about transient bottlenecks helped the site engineers to prioritize where to work.
Temperature profile had an anomaly at this instance and was duly capruted and reported