Engine Assembly Line
Ramped-up from 0 to 20 JPH in 12 weeks
Accelerate Ramp-up
Problem Statement
Production ramp up on a newly commissioned engine line

Linecraft continually monitored the critical stations on the line during ramp-up phase. Real time insights on A, P, and Q losses and insights about transient bottlenecks helped the site engineers to prioritize where to work.