Engine Assembly Line

Ramped-up from 0 to 20 JPH in 12 weeks

Accelerate Ramp-up

Problem Statement

Production ramp up on a newly commissioned engine line

Case Drilldown:

Linecraft continually monitored the critical stations on the line during ramp-up phase. Real time insights on A, P, and Q losses and insights about transient bottlenecks helped the site engineers to prioritize where to work.

Temperature profile had an anomaly at this instance and was duly capruted and reported

Result